You are seeing a free-to-access but limited selection of the activity Altmetric has collected about this research output.
Click here to find out more.
Timeline
Chapter title |
Construction Experience with Fermilab-Built Full-Length 50mm SSC Dipoles
|
---|---|
Chapter number | 66 |
Book title |
Supercollider 4
|
Published by |
Springer, Boston, MA, January 1992
|
DOI | 10.1007/978-1-4615-3454-9_66 |
Book ISBNs |
978-1-4613-6529-7, 978-1-4615-3454-9
|
Authors |
M. J. Blessing, R. C. Bossert, J. S. Brandt, J. A. Carson, S. Delchamps, K. D. Ewald, H. J. Fulton, M. Gordon, J. E. Haggard, W. Higinbotham, D. E. Hoffman, R. H. Jensen, W. Koska, M. D. Packer, R. K. Rihel, W. F. Robotham, R. Sims, B. E. Smith, D. J. Smith, J. B. Strait, G. Tassotto, D. A. Tinsley, M. Wake, M. Winters, W. F. Zimmerman, Blessing, M. J., Bossert, R. C., Brandt, J. S., Carson, J. A., Delchamps, S., Ewald, K. D., Fulton, H. J., Gordon, M., Haggard, J. E., Higinbotham, W., Hoffman, D. E., Jensen, R. H., Koska, W., Packer, M. D., Rihel, R. K., Robotham, W. F., Sims, R., Smith, B. E., Smith, D. J., Strait, J. B., Tassotto, G., Tinsley, D. A., Wake, M., Winters, M., Zimmerman, W. F. |